1
Environmental Analysis Consulting
DENGA-MAN is involved with expert engineers to conduct consultations on power loss.
2
Product Installation
Analyze the power equipment configured in the workplace, establish an installation strategy, measure the electromagnetic waves from the breakers, and report installation and results according to the installation strategy.
3
Post-Maintenance and Management
If the installation location of the product changes due to facility relocation, workplace removal, or other issues in the future, please call DENGA-MAN.